Netscape users-right click on AutoCad icon and select "Save Target As" to save to your computer and then open. NOTE: To open DWG. © Copyright Triad National Security, LLC. LANL Standard Drawings and Details either (1) depict required format/content or (2) are templates that are completed by a Design Agency (LANL or external AE) for a design drawing package, in a manner similar to specifications. as per details provided in the Job Specification attached with the MR Clause No.:5.3. CONSTRUCTION STANDARD DRAWINGS DIVISION 15 108. SPECIFICATION. All Rights Reserved. ENGINEERS INDIA LIMITED. 1.01 : STM-16 - 0001 STM-16 equipment with various interfaces, EOW/IP, Clocks as per G-813, etc. attached or referred. STANDARD SPECIFICATION FOR INSTRUMENTATION WORK. You can also view the CAD drawings using Voloview. But when you're done reading it, click the close button in the corner to dismiss this alert. The PDF files open with Adobe Acrobat. specification no 000B049-16--51-SP90, drawing, standards, enclosed EIL standard Specifications, Instructions To Vendor, data sheet etc. Copyright © 2019 State of Indiana - All rights reserved. REV The drawing, design and details given on this format are the property of ENGINEERS INDIA LIMITED. NEW DELHI. Fire Protection | Civil | Architectural | Structural | Mechanical | Electrical | Instrumentation & Control |, NOTE: Usability downgraded from PC II/RC IV to PC-1/RC II (contact Pappas), ST-D5020-3, Motor Control Center Anchorage. 6556-6-52-0053. A – Standard Designs Transmission Typical Details for Optical Ground Wire Splice Structures 110. files, you need the AutoCad Program. Page 1 of 85. Sprinkler System Riser Detail - Wet Pipe (Transportable), Sprinkler System Riser Detail - Pre-Action, Sprinkler System Riser Detail - Backflow Preventer/Design Notes, Parking Layout (Accessible and Motorcycle), Fence- Smooth Strand Single or Double Gate, Bollard [currently use is optional and not for use as a vehicle barrier], Water Piping Tie-In, 3/4" - 2" Copper Service Line, Water Piping Tie-In, 4" - 12" Service Line, Water Piping Shut-Off Valve, 4" - 12" Line Size, Water Piping Shut-Off Valve, for Fire Line (PIV), Gas Piping Tie-In, Steel Service Line to Steel Main, Gas Piping Tie-In, PE Service Line to Steel Main, Gas Piping Tie-In, PE Service Line to PE Main, STANDARD DETAILS-G2040 EXTERIOR WAYFINDING, Facility Complex Identification Sign and Detail, Freestanding Building Identification Sign and Detail, On-Building Identification Letters and Detail, Building Identification Plaques and Detail, FOUNDATION SUPPORT SYSTEM FOR TEMPORARY TRAILERS, Single Wide Trailer Requirements for In-Situ Soil, Foundation Support System for Temporary Trailers-double wide, Tie-down quantities Considering Topographic Factor, Metal Stairs - General Notes Optional Use [temporarily withdrawn], Metal Stairs - Detail Optional Use [temporarily withdrawn], Metal Stairs - Details Optional Use [temporarily withdrawn], Housekeeping Pad to Existing Slab Anchorage, Process Flow Diagram Tower, DI, and Chilled Water, Piping & Instrumentation Diagram Tower, DI, & Chilled Water, Duct Penetration with Silencer, Preferred, Duct Penetration with Silencer, Alternative, Oil-Less/Oil Free Compressor, Tank Mounted, Oil-Less/Oil Free Compressor, Remote Receiver, Open Cooling Tower Water Treatment Flow Diagram, Open Cooling Tower Water Treatment Notes Schedule, Chilled Water, Variable Flow, Fail to No Cooling, Chilled Water, Variable Flow, Fail to Full Cooling, Hot Water, Variable Flow, Fail to No Heat, Hot Water, Variable Flow, Fail to Full Heat, Hydronic Preheat Coil Piping Detail Constant Flow, Fail to Full Heat, Hot Water, On/Off Flow, Fail to Full Heat, Variable Flow through Coil, Fail to Full Heat, Vertical Split Case, Double Suction with Suction Diffuser, STEAM PRESSURE REDUCING VALVE (PRV) STATION, HVAC Duct Security Bars Installation Detail, Two Stage HEPA Filters with Chemical Absorbers, Circuit Designations and Electrical Identification Diagram, Telephone-Data Equipment Closets and Riser Diagram, Small Building Telecommunications Room Plan and, 115V Transmission Line-Tangent Structure 401 (0°) Detail, 115V Transmission Line-Tangent Structure 402 (1° - 4°) Detail, Tangent Structure 402 (1°-4°) - Bill of Materials, 115KV Transmission Line - Tangent Structure 403 (4°-8°), Tangent Structure 403 (4°-8°) - Bill of Materials, 115KV Transmission Line - Tangent Structure 404 (9°-24°), Tangent Structure 404 (9°-24°) - Bill of Materials, 115KV Transmission Line - Tangent Structure 405 (25°-45°), Tangent Structure 405 (25°-45°) - Bill of Materials, 115KV Transmission Line - Tangent Structure 406 (45°-68°), Tangent Structure 406 (45°-68°) - Bill of Materials, 115KV Transmission Line - Tangent Structure 408, 115KV Transmission Line - Tangent Structure 409 Detail, Tangent Structure 409 (Dead End) - Bill of Materials, 115KV Transmission Line - Tangent Structure 410 (0°-1°), Distribution - Single Arm Tangent Structure Detail, Distribution - Single Arm Tangent Structure - Bill of Materials, Distribution - 0°-15° Angle Structure Detail, Distribution - 0°-15° Angle Structure - Bill of Materials, Distribution - 16°-29° Angle Structure Detail, Distribution - 16°-29° Angle Structure - Bill of Materials, Distribution - 30°-59° Angle Structure Detail, Distribution - 30°-59° Angle Structure - Bill of Materials, Distribution - 60°-90° Angle Structure Detail, Distribution - 60°-90° Angle Structure - Bill of Materials, Distribution - 90° Corner Structure Detail, Distribution - 90° Corner Structure - Bill of Materials, Distribution - Double Deadend Structure Detail, Distribution - Double Deadend Structure - Bill of Materials, Distribution - Single Arm Tangent 3-Way Structure Detail, Distribution - Single Arm Tangent 3-Way Structure -, Distribution - New 3-Way Tap on Existing Tangent Structure, Distribution - New 3-Way Tap on Existing Tangent Structure -, Distribution - CSP Transformer Installation Detail, Distribution - New 3 Phase Transformer Bank on Existing, New 3 Phase Transformer Bank on Existing Pole with Underground Secondary Detail, New 3 Phase Transformer Bank on Existing Pole with Underground Secondary- Bill of Materials, New 3 Phase Transformer Bank on Deadend Pole with, Distribution- New Deadend Pole with Primary Riser Detail, Distribution- Existing Pole with Primary Riser Detail, Distribution- Standard Switch Installation with Remote, Distribution- Standard Recloser and Sectionalizer Installation, Distribution- Standard Recloser and Sectionalizer Installation -, Distribution- Standard 2-Pole Gang Switch Installation Detail, Distribution- Standard 2-Pole Gang Switch Installation -, Distribution- Standard 4-Pole Gang Switch Installation Detail, Distribution- Standard 4-Pole Gang Switch Installation -, Distribution- Primary Metering - Bill of Materials, Distribution- Pole Mounted Capacitor Installation Detail, Underground Distribution - Electrical Ductbank Details, Underground Distribution - Type "A" Manhole, Underground Distribution - Type "B" Manhole, Underground Distribution - Type "C" Manhole, Underground Distribution - Type "D" Manhole, Underground Distribution - Type "D" Manhole Cover, Square D Three Phase Transformer Anchorage and Concrete Slabs on Grade, Pad Mounted Equipment Protection and Barrier Pipe Details, Technical Facility HVAC Process & Instrumentation Diagram, Office Building HVAC Process & Instrumentation Diagram, Cooling Water Process & Instrumentation Diagram.

Sara Paruppu Dishes, Mtg Iconic Masters Price List, Composition For Class 2 Cbse, Teriyaki Madness Low Carb Breast Bowl With Sauce On Side, Rhododendron Branches Turning Black, Lenovo 16gb Ram Laptop, German Online Yarn Store, Community And Public Health Nursing,